BMW R1150RT - MAINTENANCE INTEGRAL ABS Wartungshandbuch Seite 40

  • Herunterladen
  • Zu meinen Handbüchern hinzufügen
  • Drucken
  • Seite
    / 96
  • Inhaltsverzeichnis
  • LESEZEICHEN
  • Bewertet. / 5. Basierend auf Kundenbewertungen
Seitenansicht 39
00.35
13 72 000 Replacing intake air filter
element
(Inspection III)
in very dirty and dusty operating conditions,
replace every 10,000 km (6,000 miles) or even
more frequently if necessary
Open clips securing air filter cover.
Replace air filter element.
Close air filter cover.
12 31 240
Replacing Poly-V belt
(Inspection III)
every 60,000 km (36,000 miles)
Remove left side fairing panel.
Remove front intake pipe.
Disengage fairing bracket from end cover on left.
Remove front cover.
Slacken alternator securing screws (1,3,4).
Remove old Poly-V belt.
L Note:
Loop Poly-V belt over crankshaft belt pulley first,
then over alternator belt pulley.
Install new Poly-V belt.
Poly-V belt adjusting procedure:
Place the Poly-V belt in position, tension it and
turn the engine over once, then relieve belt ten-
sion.
Poly-V belt tensioning procedure:
1 Slightly tighten hex nut (1) on adjusting screw (2)
by hand (do not use tools).
2 Tighten adjusting screw (2) with a torque wrench
and keep preload applied.
3 Tighten upper retaining nut (3), then remove
torque wrench from adjusting screw.
4 Tighten all screws and nuts.
X Tightening torque:
Preload for Poly-V belt ................................... 8 Nm
Belt pulley to alternator ................................ 50 Nm
Belt pulley to crankshaft............................... 50 Nm
Alternator to alternator support cover........... 20 Nm
R22000130
R22110010
RS110480
1
2
3
4
Seitenansicht 39
1 2 ... 35 36 37 38 39 40 41 42 43 44 45 ... 95 96

Kommentare zu diesen Handbüchern

Keine Kommentare