BMW R 1200 CL Wartungshandbuch Seite 55

  • Herunterladen
  • Zu meinen Handbüchern hinzufügen
  • Drucken
  • Seite
    / 108
  • Inhaltsverzeichnis
  • LESEZEICHEN
  • Bewertet. / 5. Basierend auf Kundenbewertungen
Seitenansicht 54
PDI Procedures - Removing, Filling and Charging Battery
53
R 1200 CL
R 1200 CL Introduction
Note: Various models will eventually be
factory equipped with a GEL CELL
type battery. When this change over
occurs, this PDI procedure will be
revised. Please refer to appropriate
Service Bulletin and or Battery
Information Sheet located in Technical
Training Section of MTAS.
Remove battery breather tube and
hold down bracket.
Lift battery out of tray.
Remove battery and fill with electrolyte
Warning:
Battery electrolyte is acid and is extremely caustic. Protect your eyes,
face, hands, clothing and protect the motorcycle paint work.
Fill the battery with electrolyte, replace the caps,
and let stand for one hour.
Remove air bubbles and top off with more elec-
trolyte if necessary.
Charge the battery for 10 hours at a 2 amp rating. Use the appropriate charg-
ing system, do not use a maintenance trickle charger.
Let battery stand for 24 hours before testing the battery.
Specific gravity of the electrolyte in a fully charged battery should measure
1.26 or above in each cell. This measurement is taken with a high quality bat-
tery hydrometer.
Mark the date on the battery.
Make sure the ignition is turned off.
Connect the red positive lead first,
then the black negative lead last.
Remember to reconnect the vent.
Replace the retaining tray.
Apply acid-proof grease to the bat-
tery terminal posts.
Electrolyte =
• 35% Sulfuric Acid,
• 65% Water
Specific gravity = 1.28
Mark the Service Date on the Battery Label
Seitenansicht 54
1 2 ... 50 51 52 53 54 55 56 57 58 59 60 ... 107 108

Kommentare zu diesen Handbüchern

Keine Kommentare