BMW K100 LT Bedienungsanleitung Seite 27

  • Herunterladen
  • Zu meinen Handbüchern hinzufügen
  • Drucken
  • Seite
    / 30
  • Inhaltsverzeichnis
  • LESEZEICHEN
  • Bewertet. / 5. Basierend auf Kundenbewertungen
Seitenansicht 26
Testing the electrical power at the fuel injectors:
Because of the injection time varying from 1.5ms to 9ms., it is best is to use an LED
to test the EFI computer output. A cheap regular LED should work for this purpose
but they are rated for 3.3v/20mA. A resistance would have to be installed in series
with the LED in order to drop the voltage to 3.3 volts. At some hobby stores (Radio
Shack, The Source..) you are able to buy 12V LED and with them, the resistor won't
be needed. The following schematic shows the testing at the fuel injectors.
(Red/Green and Yellow/Green are the 2 wires feeding each injector)
Testing the coil of the fuel injector
Testing if the Fuel injector relay provides a positive voltage to the injector:
The positive should be permanent as long as the ignition is ON, the kill switch is on
the "running" position and the starter button is pressed.
The positive connection to the injectors is also feeding the airflow meter, the idle
switch and the fuel pump. If you get a low voltage, disconnect these 3 devices and the
FI computer. If one is bad it can drain the voltage. If you get the 12 volts, plug
Seitenansicht 26
1 2 ... 22 23 24 25 26 27 28 29 30

Kommentare zu diesen Handbüchern

Keine Kommentare