BMW 740Ld Bedienungshandbuch Seite 222

  • Herunterladen
  • Zu meinen Handbüchern hinzufügen
  • Drucken
  • Seite
    / 268
  • Inhaltsverzeichnis
  • LESEZEICHEN
  • Bewertet. / 5. Basierend auf Kundenbewertungen
Seitenansicht 221
4. Insert the sealant container on the com‐
pressor housing in an upright position.
5. Screw the filling hose of the sealant con‐
tainer onto the tire valve of the defective
wheel.
6. With the compressor switched off, insert
the plug into the power socket inside the
vehicle.
7. With the ignition turned on or the engine
running, reel on the compressor.
Switch off the compressor after 10 mi‐
nutes
Do not allow the compressor to run longer than
10 minutes; otherwise, the device will overheat
and may be damaged.◀
Let the compressor run for approx. 3 to 8 mi‐
nutes to fill the tire with sealant and achieve a
tire inflation pressure of approx. 2.5 bar.
While the tire is being filled with sealant, the
tire inflation pressure may sporadically reach
approx. 5 bar. Do not reel off the compressor at
this point.
If a tire inflation pressure of 2 bar is not
reached:
1.
Switch off the compressor.
2. Unscrew the filling hose from the wheel.
3. Drive 33 ft/10 m forward and back to dis‐
tribute the sealant in the tire.
4. Inflate the tire again using the compressor.
If a tire inflation pressure of 2 bar cannot be
reached, contact your service center.
Stowing the Mobility System
1.
Unscrew the filling hose of the sealant con‐
tainer from the wheel.
2. Unscrew the connection hose of the com‐
pressor from the sealant container.
3. Connect the filling hose of the sealant con‐
tainer previously connected to the tire
valve with the available connector on the
sealant container.
Seite 218
Mobility Wheels and tires
218
Online Edition for Part no. 01 40 2 954 177 - II/15
Seitenansicht 221
1 2 ... 217 218 219 220 221 222 223 224 225 226 227 ... 267 268

Kommentare zu diesen Handbüchern

Keine Kommentare