BMW R1100 Bedienungsanleitung Seite 13

  • Herunterladen
  • Zu meinen Handbüchern hinzufügen
  • Drucken
  • Seite
    / 28
  • Inhaltsverzeichnis
  • LESEZEICHEN
  • Bewertet. / 5. Basierend auf Kundenbewertungen
Seitenansicht 12
Double ceramic ball bearing turbocharger. The exhaust housing has been coated in
silver ceramic. The AN4 oil feed line must be tightened down securely otherwise and
CCW twisting motion on the stainless feed line will loosen the fitting. Use 9/16” wrench
to tighten.
Four 5/16” x 18 x 1.5” Hex bolts with washers, lock washers and hex nuts hold turbo to
connector tube. Sequence is bolt, washer and then lock washer and nut on reverse
side. Bottom bolts inserted front to rear. Top left rear to front. Top right front to rear.
Five 8mm x 1.25 x 1 25mm stainless steel socket head cap screws and lock washers.
You must install the turbo exit pipe (page 14) before you install the turbo.
BMW R1100/1150 General Turbo Instructions rbracing-rsr.com
13
Seitenansicht 12
1 2 ... 8 9 10 11 12 13 14 15 16 17 18 ... 27 28

Kommentare zu diesen Handbüchern

Keine Kommentare