BMW R1100 Spezifikationen Seite 6

  • Herunterladen
  • Zu meinen Handbüchern hinzufügen
  • Drucken
  • Seite
    / 64
  • Inhaltsverzeichnis
  • LESEZEICHEN
  • Bewertet. / 5. Basierend auf Kundenbewertungen
Seitenansicht 5
6
Lube and Adjust Clutch Cable
adjust maximum slack at clutch lever, at rear of transmission pry clutch release arm to
release the clutch cable there, lube both ends of clutch cable with BMW #10 grease,
reattach cable, using the knurled adjuster at the hand lever adjust to 12mm between it
and the knurled locknut, at clutch release arm loosen the 13mm locknut using 13mm
deepwell socket and swivel, adjust the 10mm bolt to give 7mm freeplay at the hand
clutch lever, pull in the hand clutch lever while tightening the locknut at the rear clutch
arm (see Paul Glaves and Bob Gorman "Clutch Adjustment")
Lube Front Shock Lower Mount
remove nut (15mm), remove bolt (14mm), lube bushing with BMW #10 grease, install
bolt (second person needed at rear of bike), torque to 37 ft.lb. (50 Nm)
Lube Side Stand and Center Stand
grease fitting on some RSs only, others lube with WD40 if necessary
Check Brakes
check brake fluid levels front and back, check brake pads for wear, bleed brakes yearly
(see Carl Kulow Brake Pad Replacementand Stephen Karlan Brake Bleeding)
Inspect Battery
remove tank trim (R1100R) or side panels, remove tank bolt on right side, RS – remove
screws that attach front of tank to fairing, slide tank back and set on chair, fill battery
with distilled water, grease battery posts, leave tank off if doing a fuel filter change
Replace Fuel Filter
need: siphon, fuel filter, large o-ring, 2 small clamps, 2 tiny pencil size clamps, empty
gas can, rubber gloves, 8mm socket, replace every 24K miles, siphon gas from tank,
remove tank, with pencil mark orientation of plate to tank, with tank on side remove the
fuel pump plate using 8mm socket, disconnect fuel overflow and vent hoses (two small
inside hoses) remove unit from tank, replace fuel filter noting flow direction, reconnect
using two small screw clamps, insert new o-ring into tank groove, insert unit into tank,
reconnect two small hoses being sure to connect striped hose to striped hose using two
tiny clamps, tighten plate, install tank, check for leaks (see Jon Diaz "Fuel Filter
Change")
Test Ride Bike
(ride ~15 min. to get bike to operating temperature for throttle body sync)
Seitenansicht 5
1 2 3 4 5 6 7 8 9 10 11 ... 63 64

Kommentare zu diesen Handbüchern

Keine Kommentare